Low-altitude slide construction method
It is a full casing (full rotary) method that enables work up to a depth of 4.4 meters.
We have made it possible to carry out construction that was previously impossible. - Foundation work inside the gymnasium: Previously, part of the wall had to be demolished to bring in machinery, but it is now possible to bring in equipment without altering the current state. - Foundation work along the railway: Work that requires crane booms to extend higher than the tracks is typically done at night, but since we do not use cranes, daytime work is possible. - Bridge widening and under-beam work: Heavy machinery can access the existing under-beam area, allowing vehicles to continue using the existing bridge during construction. - Work under high-voltage power lines: Construction under high-voltage power lines is also feasible.